Aviation investigation infrastructure

Aviation investigation infrastructure.One record. The whole investigation.

SeyAero is the evidentiary record for aviation accident and near-miss investigation. Every fact an investigation holds, recorder data, cockpit audio, radar tracks, weather, maintenance history, crew and passenger records, enters one synchronised, tamper-evident record that the analysis, the report and the defence of the report all draw from. The account of what happened and the proof of how it was reached are the same object.

Evidence classes
7+
Case instruments
27
Output
Annex 13
SeyAero reconstruction view: fitted flight trajectory over terrain and sea, wreckage probability contours, parameter traces and a synchronised master timeline
Reconstruction view · trajectory · contours · one clock

Not another tool

Investigations run on files. They should run on infrastructure.

One evidentiary record holds every fact, the synchronised reconstruction, the ranked hypotheses, the search zones and the report. Every fact enters once, is hashed and time-stamped, sits on one master clock, and stays bound to every conclusion it supports.

The record is the case
Evidence, analysis and report are views onto one object, not three artefacts that can drift apart.
The reasoning is preserved
Every drafted sentence traces back to the exact record it rests on, years later, under any reviewer.
The method is published
Assumptions, failure modes and back-test results are public documents, so the infrastructure can be judged, not just bought.
The organisation compounds
Recommendations, precursor patterns and sealed predictions outlive any single case and any single investigator.

Evidence intake

Every source an investigation touches, in one ledger.

FDR
Flight Data Recorder

Parameter traces, sampling gaps, sensor drift.

CVR
Cockpit Voice

Transcripts, callouts, crew workload markers.

RDR
Radar & ADS-B

Track reconstruction and secondary returns.

MET
Meteorology

METAR, SIGMET, icing and shear layers.

MX
Maintenance

Deferred defects, cycles, component history.

CRW
Crew & Manifest

Duty time, ratings, passenger and load data.

What the record enables

The whole investigation, running on one record.

Seven capability groups, from the first squawk to a signed, verifiable report — all reading from, and writing back to, the same evidentiary record.

A

Live capture

The case opens itself

  • Emergency squawk (7500/7600/7700) auto-opens a live case
  • Streaming recorder telemetry ingested while airborne
  • Live ATC frequency recorded and auto-transcribed
  • NEXRAD radar, lightning and turbulence pulled to the aircraft's position
  • Rescue-window alerts estimate terrain, exposure and response urgency after signal loss
B

Reconstruction

One clock, one account

  • Master timeline synchronising FDR, CVR, radar and observers
  • Physics-based trajectory fitting through sparse or noisy tracks
  • 3D flight playback from ingested telemetry
  • Ranked causal hypotheses with confidence scoring
C

Occurrence analysis

Every accident class, one discipline

  • All-phase physics: take-off, climb, cruise, approach, landing and ground roll
  • Overrun, obstacle and building strike, midair conflict geometry and TCAS advisory compliance
  • Rotorcraft solved on a rotary-wing frame: autorotation energy, height–velocity, vortex ring, rotor integrity
  • Propeller aircraft solved on a propeller frame: feathering drag, Vmca margin, overspeed, blade-signature power at impact
  • Ditching, in-flight fire and icing hazard frames with explicit uncertainty
  • Fuel, pressurisation, incapacitation, loading, turbulence, wake and deliberate-interference frames
  • Structural break-up and lifting-surface separation with bounded wreckage estimates
  • Energy-bounded counterfactuals, survivability bands and evidence-gap radar
  • Probable cause is refused where the evidence cannot carry it — see the analysis engines record
D

Hull-loss search

Where to look first

  • Monte Carlo end-of-flight and drift modelling
  • Recovered-debris backcasting with dated currents and selectable drift models
  • Probability contours and prioritised search sectors
  • Bayesian re-weighting as each sector is cleared
  • Date-line crossings are marked indicative rather than presented with false precision
  • Benchmarked against historical losses on the validation record
E

Reporting

Accepted across borders

  • One-click ICAO Annex 13 draft bound to verified evidence
  • Every sentence footnoted to the exact FDR row or transcript line
  • Renditions in 20 languages with a frozen terminology glossary
  • Signed release with staleness tracking on every translation
F

Evidence integrity

Defensible in an inquiry

  • Zero-knowledge vault — files encrypted on-device before upload
  • SHA-256 hashing at ingest with a tamper-evident audit chain
  • Notarised anchors anyone can check at /verify, no account needed
  • Reviewer approval gate before any transcript becomes evidence
  • Independent security assurance documentation, released under NDA
G

Programme control

Run it as an organisation

  • Role-based access for investigators, leads and case owners
  • Scoped external adviser packs with conflict declarations and selected-file access
  • Privacy-preserving fleet-wide precursor and near-miss pattern analytics
  • Procurement desk: proforma, PO upload, counter-signed order forms
  • Multi-jurisdiction privacy posture — GDPR, CCPA/CPRA, LGPD and more

Tool atlas

Every tool inside a SeyAero case file.

A complete workbench across four phases — all operating on the same case, the same clock and the same audit chain.

Evidence

Get every fact into the case file, hashed and time-stamped.

6 tools

  • Exhibits

    Encrypted vault upload, SHA-256 at ingest, custody manifest.

  • Media

    Photo, video and audio evidence with AI-assisted description and OCR.

  • Normalize

    ARINC 429 / FDR / QAR decoding into a common parameter dictionary.

  • Feeds

    Live ADS-B, radar and streaming recorder telemetry.

  • Ambient

    Live ATC frequency capture with automatic transcription.

  • CVR workbench

    Cockpit audio transcript, callouts, warning cues, crew workload.

Analysis

Turn evidence into a defensible account of what happened.

17 tools

  • Master timeline

    All sources on one clock; conflicts surfaced, not buried.

  • Map

    Track, terrain, bathymetry and geospatial weather overlays.

  • Physics matrix

    Energy balance, drag and stall-margin cross-verification.

  • Separation

    Conflict geometry and near-miss separation analysis.

  • 3D reconstruction

    Flight playback rebuilt from fitted trajectory data.

  • Wreckage search

    Monte Carlo descent and drift, probability contours, Bayesian sweeps.

  • Debris drift

    Recovered-object backcasting by date, current field and drift model, with reliability warnings.

  • Counterfactual

    Intervention trials bounded by climb rate and available energy.

  • Sequence & sufficiency

    Causal ordering, Annex 13 sufficiency scoring, evidence-gap radar.

  • Survivability

    Deceleration, cabin integrity, exits, fire, terrain, exposure and rescue timing — reported as a band.

  • Rotorcraft

    Autorotation energy, height–velocity, vortex ring and rotor integrity.

  • Propeller aircraft

    Feathering drag, minimum control speed, overspeed and blade-signature power at impact.

  • Hazard frames

    Ditching, in-flight fire and icing.

  • Blind suite

    Re-run the public-observable regression checks from inside a case.

  • Causal analysis

    HFACS and fault-tree models with confidence-ranked hypotheses.

  • Human factors

    Duty, fatigue, workload and crew-performance modelling.

  • Airworthiness

    Maintenance history, deferred defects, component and cycle history.

Assurance

Prove the chain holds up in an inquiry.

7 tools

  • Verify

    Recompute the audit hash chain for the whole case.

  • Lineage

    Fact-level provenance from every drafted sentence back to source.

  • Review

    Reviewer approval gate before anything becomes evidence.

  • Peer review

    Independent second-investigator sign-off with recorded dissent.

  • Alerts

    Acknowledged case notifications and escalation trail.

  • Adviser

    Selected-file specialist access, signed scope and a recorded conflict declaration.

  • Assistant

    Case-scoped AI analyst constrained to verified records.

Output

Ship something a regulator, insurer or court will accept.

6 tools

  • Annex 13 draft

    One-click ICAO-aligned report, every claim footnoted.

  • Renditions

    20 languages with a frozen terminology glossary and staleness tracking.

  • Recommendations

    Safety recommendation register with owner and status.

  • Notarisation

    Signed, publicly verifiable integrity seal at /verify.

  • Sealed predictions

    HMAC-signed forecasts published before outcomes at /track-record.

  • Team & programme

    RBAC, case ownership, fleet precursor analytics, procurement desk.

Debris scatter probability contours and prioritized sonar search sectors generated by SeyAero

Hull-loss localisation

Where to send the ship, in priority order.

Last known state, performance envelope, wind transport and sea drift are propagated through a Monte Carlo end-of-flight model. The output is a probability field with ranked search sectors that re-weight themselves as each sweep comes back empty — validated against real hull losses across every environment category.

How it works

01

Ingest everything

Write a free account of the occurrence, confirm the drafted case summary, then follow a live evidence guide. Auto-ingest can assemble ADS-B, weather and available ATC material while every record remains pending, verified or conflicted.

02

Synchronize the truth

Records are aligned onto one master timeline so cockpit audio, telemetry and external observations sit on the same clock. Conflicts surface instead of hiding in a spreadsheet.

03

Reconstruct and rank

The reconstruction engine builds the causal chain and scores competing hypotheses by confidence, so investigators argue over evidence, not over file formats.

04

Locate the wreckage

For hull-loss events, last known state, drift and performance envelopes produce probability contours and prioritized search sectors.

Built for

Investigation authorities

Annex 13-ready evidence chain and reporting.

Airlines & operators

Fleet-wide precursor and near-miss patterns.

Manufacturers

Component and software fault correlation.

Insurers

Defensible causation with traceable provenance.

Start your case file

Create an investigator account, open a case, and add the data, facts and statements you already have. Records stay private to your account and carry a full verification trail.